D.G. Posts F. No. 12-03/2010-PAP dated 30th September, 2010.
The undersigned is directed to forward herewith a copy of the Ministry of Urban
Development (Housing-III Section), New Delhi, OM No. I-17011/2/\(1)/2009-H.III
dated 14th July,2010 on the subject cited above, for kind information
and further necessary action.
Sdxxx
(K. Ramesawara
Rao)
Asstt.
Director General (Estt.)
Copy of OM No. I-17011/2/\(1)/2009-H.III dated 14th
July,2010 from Ministry of Urban Development (Housing-III Section) , New Delhi.
Sub: Interest
bearing advance /Sixth Central Pay Commission recommendation on House
Building Advance-enhancement in past – regarding
The undersigned is directed to invite attention to this Ministry's O.M. No.
1-17011/11(3\4)/2008-H.III dated 27th November, 2008 on the above
subject and to say that it has been decided in consultations with Ministry of
Finance to make the afore-said orders applicable with effect from 1st
January, 2006. Accordingly, an enhancement of House Building Advance, if applied
for, may be granted for an amount equivalent to the difference between the
previously sanctioned amount and the new amount determined on the basis of pay
in the pay band, in past case, where HBA was sanctioned on or after 1-1-2006 but
before 27-11-2008 subject to complying following conditions:
(a) The Government servant should not have drawn the
entire amount of HBA sanctioned under earlier orders and /or where construction
is not completed /full cost towards acquisition of house /flat is yet to be
paid.
(b) There will be no deviation from the approved plan
of construction on the basis of which the original sanction of House Building
Advance was accorded. The revised cost of the original plan can, however, be
considered for determining the additional amount, subject to the prescribed
maximum limits.
(c) Supplementary Mortgage Deed, Personal Bond and
Sureties will be drawn and executed at the expense of the loanee.
(d) The actual entitlement will be restricted to the
repaying capacity computed on the basis of the formula laid down in
this Ministry's O.M. No. 1-17015/16/92-H.III. dated 17.10.2000. It should be
ensured that the entire amount of advance with interest is recovered before
retirement on the Government servant.
(e) Rate of Interest: The rate of interest chargeable
in such cases would be as per the slab applicable to the total sanctioned amount
i.e. amount already sanctioned on or after 1-1-2006 but before 27-11-2008 plus
the enhanced sanction. However, the new rate of interest would be chargeable
only on collective amount that would remain outstanding on grant of enhancement
of HBA i.e., the unpaid portion of previously sanction HBA plus the enhancement
so granted. Thus, the amount of HBA that has already been re-paid on old rates
will not attract the fresh interest charges.
2. However, the existing limit of maximum admissible
amount of Rs. 7.50 lakh for the purpose of construction /purchase of new house
/flat and Rs. 1.80 lakh would remain unchanged. In other words, the sum total of
previously sanctioned HBA and the enhancement granted under these orders cannot
exceed the aforesaid limits. In nay case, not more than one enhancement is
admissible to Govt. employees.
3. The applications for enhancement HBA should be
submitted within six months from the date of issue of this order.
4. Ministries/Departments whose branch offices are
situated in the far flung areas like in case of Ministry of Defence, etc., are
advised to give wider publicity to these orders through modern communication
means like facsimile, e-mail, web-site, etc. so that there is no occasion for
any representationfor extending the time limit of six months on the grounds of
receiving these orders late.
Sdxxx
(V.K. Gupta)
Deputy
Financial Adviser
Source- NPPE
No comments:
Post a Comment
Feel free to drop your comments and suggestions